Skip to content

Reading, Berkshire ยท Founded 2010

Water and gas sub-metering for buildings where the shared bill has stopped being fair.

Quarter Metering specifies, supplies and installs tenant-level water and gas meters for landlords, block managers, HMO operators and small commercial estates.

01

Water Sub-Metering

Cold water mechanical meters, pulsed-output registers, riser cupboard work and tenant branch identification.

02

Gas Sub-Metering

Diaphragm sub-meters installed only with safe isolation, testable pipework and clear certification scope.

03

Meter Schedules

Serial numbers, flow direction, label references, photographs and tenant allocation in one usable record.

04

Handover Packs

Commissioning sheets and reading access notes that a managing agent can still understand in two years.

Where the money goes wrong

One incoming supply, six different arguments.

Shared supplies become expensive when an annex, workshop, shop unit, HMO room cluster or converted flat has no accountable reading. The problem is rarely the meter itself. It is the missing proof that a specific pipe serves a specific tenancy.

Quarter Metering works where fairness depends on measuring the right branch, leaving it readable, labelling it correctly and giving the landlord a schedule that survives staff changes, voids and future disputes.

The direct promise

Measured pipe. Labelled meter. Photographed serial number. Tenant allocation table.

No soft funnel, no vague maintenance package and no attempt to sell smart disconnection systems. If the building needs accountable consumption by unit, the work is specified, installed, recorded and handed over.

2010

Started in Reading after Martin Vale saw too many shared utility disputes that a clear meter schedule would have prevented.

45 miles

Regular working radius from Reading across Berkshire, Oxfordshire, Hampshire, Surrey, west London and Wiltshire.

10 to 15

Normal lead time is 10 to 15 working days from accepted quotation. Urgent landlord handover works can usually be surveyed within 72 hours.

No form

Email hello@quartermeter.com with photographs, postcode, units and whether gas or water is involved.

Martin keeps a spare roll of 12 mm black-on-yellow Brother tape in the van because the plant room at a Caversham conversion taught him never to trust site labels.