The Meter Schedule Is the Job.
A neat meter without a schedule is unfinished. It may look persuasive on the day of installation, but it does not protect a landlord when the tenant changes, the managing agent changes, or a dispute arrives six months later with a photograph of a cupboard and no context.
Quarter Metering records the serial number, meter size, flow direction, unit allocation, label reference and photograph for each meter. A schedule pack is £65 + VAT per meter when supplied after an installation, and it states where the meter can be read, what the label says, and which tenancy the branch was allocated to at handover.
The reason is practical rather than bureaucratic. Meters get boxed in. Cupboard keys disappear. A shop becomes two studios. A resident insists their neighbour is on the wrong feed. If the original record is vague, every future reading inherits that uncertainty.
Martin’s rule is simple: if a stranger cannot stand in the plant room with the handover pack and identify the correct meter, the installation has not been handed over properly.